ISSN 1006-3021 CN11-3474/P
Published bimonthly started in 1979
万家寨水库右岸岩溶渗漏试验研究
  
关键词:karst leakage  Wanjiazhai water conservancy facilities  tracing test
基金项目:中国地质科学院水文地质环境地质研究所和水利部天津水利水电勘测设计研究院勘察院合作项目“万家寨水利枢纽库区右岸岩溶渗漏强入渗带示踪试验研究”
作者单位E-mail
贾秀梅 中国地质科学院水文地质环境地质研究所河北石家庄050061 jiaxiumei0003@sina.com 
刘满杰 水利部天津水利水电勘测设计研究院勘察院天津300222  
孙继朝 中国地质科学院水文地质环境地质研究所河北石家庄050061  
齐继祥 中国地质科学院水文地质环境地质研究所河北石家庄050061  
臧逸中 中国地质科学院水文地质环境地质研究所河北石家庄050061  
鲁静 中国地质科学院水文地质环境地质研究所河北石家庄050061  
摘要点击次数: 2474
全文下载次数: 2350
摘要:
A Tracing Test of Karst Leakage on the Right Bank of Wanjiazhai Reservoir
      The karst leakage on the right bank of the Wanjiazhai water conservancy facilities is a hidden trouble in the safe operation of the reservoir, and hence much attention was paid to it during the exploration and designing of the reservoir. In the course of water storage for the reservoir, the authors conducted researches on the key leakage segments with the tracing test and some other methods. The leakage ways and intensity were detected and the feasible method for the investigation of the karst leakage of the reservoirs in the northern part of China was thus suggested.
JIA Xiu-mei,LIU Man-jie,SUN Ji-chao,Qi Ji-xiang,ZANG Yi-zhong,LU Jing.2005.A Tracing Test of Karst Leakage on the Right Bank of Wanjiazhai Reservoir[J].Acta Geoscientica Sinica,26(2):179-182.
查看全文  查看/发表评论  下载PDF阅读器
Copyright©2008 All Rights Reserved
Sponsored by:
Address:: PostCode: Tel: E-mail: