风火山隧道地应力测量及工程稳定性分析
  
关键词:Fenghuoshan tunnel  stress measurement  stress state
基金项目:国土资源部项目(编号:2002202) ;中国地质调查局项目(编号:20024013)
作者单位E-mail
吴满路 中国地质科学院地质力学研究所北京100081 Liaoct@cags.cn.net 
张春山 中国地质科学院地质力学研究所北京100081  
廖椿庭 中国地质科学院地质力学研究所北京100081  
区明益 中国地质科学院地质力学研究所北京100081  
摘要点击次数: 5491
全文下载次数: 5702
摘要:
Stress Measurement and Engineering Stability Analysis at Fenghuoshan Tunnel
      In order to detect the stress state of Fenghuoshan tunnel, the authors made stress measurement at six points around Fenghuoshan tunnel, and obtained the first data in Fenghuoshan area. The results indicate that the maximum horizontal stress is 5.5 MPa in Fenghuoshan area, and the direction is between NE and NEE. The stress value is at the medium level compared with surface stress values from other areas of China. The stress directions are quite in agreement with the present regional stress field as shown by investigation of active faults in the same area. On the basis of stress measurement in combination with engineering geological and hy-drogeological conditions and earthquake activities, the tunnel stability can be analyzed in an integrated way.
WU Man-lu,ZHANG Chun-shan,LIAO Chun-ting,OU Ming-yi.2005.Stress Measurement and Engineering Stability Analysis at Fenghuoshan Tunnel[J].Acta Geoscientica Sinica,26(1):71-74.