一种研究山前挤压构造区地应力的新方法 |
|
关键词:geophysical logging ground stress new method compressive structure foreland area |
基金项目:国家科技攻关项目专题“塔里木库车山前构造油气藏测井地应力分析”(99111010102) |
|
摘要点击次数: 5237 |
全文下载次数: 5713 |
摘要: |
A New Method for Studying Ground Stress in the Structural Compressive Area of a Foreland |
Through a comparison between distribution characteristics of logging data in the structural stable field and those in the structural compressive field, the authors put forward a new method for determining maximum horizontal in situ stress based on statistical analysis of resistivity and acoustic slowness time. The method and the model were used to calculate in situ stress in the Kuche oil field of Tarim basin. The calculated stress coincides with the result of the acoustic emission experiment. The azimuth of the maximum compressive horizontal principal stress was also obtained by using enlarged well bore breakouts in the area. The research shows an intimate relationship between the stress distribution and the distribution of petroleum pools in the area. |
LI Jun,ZHANG Chao-mo,WANG Zhong-wen,XIAO Cheng-wen,LI Jin-fu.2004.A New Method for Studying Ground Stress in the Structural Compressive Area of a Foreland[J].Acta Geoscientica Sinica,25(1):89-94. |
查看全文 查看/发表评论 下载PDF阅读器 |