ISSN 1006-3021 CN11-3474/P
Published bimonthly started in 1979
青藏铁路昆仑山隧道稳定性分析
  
关键词:tunnel  Qinghai-Tibet railway  stress calculation  engineering stability
基金项目:中国地质调查局项目(20024013)
作者单位
王薇 中国地质科学院地质力学研究所北京100081 
王连捷 中国地质科学院地质力学研究所北京100081 
王红才 中国地质科学院地质力学研究所北京100081 
乔子江 中国地质科学院地质力学研究所北京100081 
摘要点击次数: 2320
全文下载次数: 2094
摘要:
Stability Analysis of Kunlun Mountain Tunnel for Qinghai-Tibet Railway
      The Qinghai Tibet Railway is a great engineering project and also constitutes a major part in the development of western China, thus becoming one of the focuses of world attention. Construction of the railway is of great significance. The railway is planned to pass through an average height of 4 500~5 000 m above sea level and has a total length of 1 110 km, with several tunnels more than 11 km in total length to be excavated. One of them is the Kunlun Mountain tunnel over 1 600 m long surrounded by rocks of low quality. A study of the tunnel stability is very important to safety. On the basis of geological structural analysis, rock stress measurement, rock mechanical experimentation and inversion of tectonic stress field, this paper calculated stress distribution of tunnels in different sections by using finite element method. Stress pattern and ratio of rock strength to stress are given. Optimization of sections is made. It is shown that a tunnel which has curve sides and an arch bottom with ratio 1.08 of width to height is more stable than other types. Scientific basis is provided for reasonable designing, construction and long term stability of the tunnel.
WANG Wei,WANG Lian-jie,WANG Hong-cai,QIAO Zi-jiang.2002.Stability Analysis of Kunlun Mountain Tunnel for Qinghai-Tibet Railway[J].Acta Geoscientica Sinica,23(4):359-362.
查看全文  查看/发表评论  下载PDF阅读器
Copyright©2008 All Rights Reserved
Sponsored by:
Address:: PostCode: Tel: E-mail: