ISSN 1006-3021 CN11-3474/P
Published bimonthly started in 1979
黄河李家峡水电站工程坝区及外围现今构造应力场研究
  
关键词:present tectonic stress field  field finite element numerical simulation  Lijaxia on the Yellow River
基金项目:国家“八.五”科技攻关项目
作者单位
谭成轩 中国地质科学院研究生部北京 
左文智 中国地质科学院562综合大队河北燕郊 
盛昌明 中国地质矿业集团总公司筹备组北京 
摘要点击次数: 3646
全文下载次数: 2296
摘要:
A Study of Present Tectonic Stress Field in and around the Damsite of the Lijiaxia Hydropower Project on the Yellow River
      On the basis of field measurements such as in-situ fault displacement measurement ,crustalde-formation ,focal mechanism solution and stress measurement etc.,this paper gives a further analy-sis of the present tectonic stress field in the given region by the method of finite element numericalsimulation, Boch in-situ measured and simulated results show that the rock body of the dam founda-tion of the Lijiaxia hydropower station ,as a whole ,is stable ,and the whole Ⅰ and Ⅱ landslides infront of the dam are stable in natural state.
TAN Cheng-xuan,ZUO Wen-zhi,SHENG Chang-ming.1995.A Study of Present Tectonic Stress Field in and around the Damsite of the Lijiaxia Hydropower Project on the Yellow River[J].Acta Geoscientica Sinica,16(4):354-364.
查看全文  查看/发表评论  下载PDF阅读器
Copyright©2008 All Rights Reserved
Sponsored by:
Address:: PostCode: Tel: E-mail: