黄河李家峡水电站工程坝区及外围现今构造应力场研究 |
|
关键词:present tectonic stress field field finite element numerical simulation Lijaxia on the Yellow River |
基金项目:国家“八.五”科技攻关项目 |
|
摘要点击次数: 3646 |
全文下载次数: 2296 |
摘要: |
A Study of Present Tectonic Stress Field in and around the Damsite of the Lijiaxia Hydropower Project on the Yellow River |
On the basis of field measurements such as in-situ fault displacement measurement ,crustalde-formation ,focal mechanism solution and stress measurement etc.,this paper gives a further analy-sis of the present tectonic stress field in the given region by the method of finite element numericalsimulation, Boch in-situ measured and simulated results show that the rock body of the dam founda-tion of the Lijiaxia hydropower station ,as a whole ,is stable ,and the whole Ⅰ and Ⅱ landslides infront of the dam are stable in natural state. |
TAN Cheng-xuan,ZUO Wen-zhi,SHENG Chang-ming.1995.A Study of Present Tectonic Stress Field in and around the Damsite of the Lijiaxia Hydropower Project on the Yellow River[J].Acta Geoscientica Sinica,16(4):354-364. |
查看全文 查看/发表评论 下载PDF阅读器 |
|
|
|
|
|