汶川地震孕震背景与同震变化的铲形断层位错模拟 |
点此下载全文 |
引用本文:张希,王庆良,唐红涛,贾鹏.2011.汶川地震孕震背景与同震变化的铲形断层位错模拟[J].地球学报,32(2):189-194. |
DOI:10.3975/cagsb.2011.02.07 |
摘要点击次数: 4198 |
全文下载次数: 5179 |
|
基金项目:国家自然科学基金项目(编号: 40974062; 40974005) |
|
中文摘要:利用1983—1997、1997(或2007)—2008年跨龙门山断裂带长水准剖面观测资料, 借助纯逆断、铲形断层正负位错模型与网格搜索试错法, 模拟2008年5月12日四川省汶川县8.0级特大地震前闭锁背景与同震变化, 在一定程度上反映出龙门山中央断裂震前应变能积累、震时反弹的特性。 |
中文关键词:汶川大震 长水准剖面 铲形位错 孕震背景 |
|
The Simulation on Listric-fault Dislocation Background and Co-seismic Deformation of the Wenchuan Earthquake |
|
|
Abstract:Using long-leveling section observation data crossing Longmenshan fault during the period of 1983-1997 and 1997 (or 2007)-2008, aided by positive and negative dislocation model of pure thrust and spade-fault, in combination with the method for grid-searching and testing, the authors simulated the locked energy background before the Wenchuan Ms8.0 great earthquake of Sichuan Province on 12 May, 2008 and its co-seismic deformation. The energy accumulation before this earthquake and co-seismic rebounding of Central Longmenshan fault are revealed to some extent. |
keywords:Wenchuan great earthquake long-leveling section listric dislocation occurrence background |
查看全文 查看/发表评论 下载PDF阅读器 |