滇藏铁路沿线滇藏交界段劈理化带成因探讨及工程效应分析
    点此下载全文
引用本文:张加桂,张永双,曲永新.2009.滇藏铁路沿线滇藏交界段劈理化带成因探讨及工程效应分析[J].地球学报,30(6):885-892.
DOI:10.3975/cagsb.2009.06.21
摘要点击次数: 2978
全文下载次数: 4779
作者单位E-mail
张加桂 国土资源部新构造运动与地质灾害重点实验室中国地质科学院地质力学研究所 jiagui62@sina.com 
张永双 国土资源部新构造运动与地质灾害重点实验室中国地质科学院地质力学研究所  
曲永新 中国科学院地质与地球物理研究所  
基金项目:中国地质调查局地质调查工作项目“滇藏铁路沿线地壳稳定性调查评价(1212010541404)”和“西南三江地区区域地壳稳定性评价及分区图(1212010541406)”
中文摘要:滇藏铁路沿线滇藏交界段劈理化带是新近发现的与高山峡谷区河流岸坡密切相关的介于劈理与节理之间的密集破裂构造型式。我们对劈理化带进行了较全面的调查、测绘、统计和分析, 由此得出, 劈理化带呈带状断续分布, 规模与河流岸坡规模有关, 在金沙江和澜沧江岸坡地带规模巨大, 并与微地貌关系密切。另外, “劈理”具有倾角陡、不均匀等特点, “劈理”走向往往与河流方向一致。劈理化带是在内、外动力相互作用下形成, 内动力作用可以形成劈理化带, 在内动力作用的基础上, 河谷地带的外动力作用也可以形成劈理化带, 内、外动力对劈理化带均有后期改造作用。拟建的滇藏铁路将通过许多劈理化带, 那里将来可能产生铁路地基大变形、隧道和桥梁大变形、隧道冒顶、隧道渗漏和发生滑坡、崩塌、泥石流灾害。因此, 在将来铁路等工程建设和运营中要采取针对性防治措施。
中文关键词:劈理化带  河床泥化圈层  工程效应  滇藏铁路  金沙江  澜沧江
 
A Tentative Discussion on the Genetic Mechanism of the Cleavable Zone along the Yunnan-Tibet Border Sector of the Yunnan-Tibet Railway Line and an Analysis of its Engineering Effect
Abstract:The newly discovered cleavable zone along the Yunnan-Tibet border sector of the Yunnan-Tibet railway line is a transitional tectonic type with close-spaced fractures between the cleavage type and the joint type, which is closely related to the river slope in the gorge area between high mountains. Based on relatively comprehensive survey, mapping and statistic analysis, the authors have reached the conclusion that the cleavable zone is distributed in the discontinuous banded form, with its scale in relation to the river slope scale, so there exist large-sized zones along the Jinsha River and the Lancang River, and that the cleavable zone is in connection with the local micro-landform. In addition, the “cleavage” in the zone is characterized by steep dip angle and uneven interval, with its strike usually paralleled to the local river orientation. The zone was generated by the interaction between the endokinetic process and the exogenous process. This means that the cleavable zone could be generated by the endokinetic process, and that on the basis of the endokinetic process, the cleavable zone along rivers could also be formed by the exogenous process. Furthermore, the cleavable zone could be altered by later endokinetic or exogenous process. The scheduled Yunnan-Tibet Railway will pass through many cleavable zones, and there might occur serious deformation of railway foundation, tunnel and bridge, collapse over tunnel, percolation around tunnel, and geohazards such as landslide, collapse and debris flow. It is suggested that we should take appropriate control meas-ures to tackle these problems in the construction and operation processes of the railway and other projects.
keywords:cleavable zone  argillation circle in river bed  engineering effect Yunnan-Tibet Railway  Jinsha River  Lancang River
查看全文  查看/发表评论  下载PDF阅读器
版权所有 《地球学报》编辑部 Copyright©2008 All Rights Reserved
主管单位:中华人民共和国自然资源部 主办单位:中国地质科学院
地址: 北京市西城区百万庄大街26号,中国地质科学院东楼317室 邮编:100037 电话:010-68327396 E-mail: diqiuxb@126.com
技术支持:北京勤云科技发展有限公司
京ICP备05029128号-6