黄河李家峡水电站工程坝区及外围现今构造应力场研究 |
点此下载全文 |
引用本文:谭成轩,左文智,盛昌明.1995.黄河李家峡水电站工程坝区及外围现今构造应力场研究[J].地球学报,16(4):354-364. |
DOI: |
摘要点击次数: 3645 |
全文下载次数: 2296 |
|
基金项目:国家“八.五”科技攻关项目 |
|
中文摘要:本文在实测现今构造应力场分析的基础上,运用有限元数值模拟方法对黄河李家峡水电工程坝区及外围现今构造应力场作了进一步分析:认为李家峡水电工程坝基岩体在完整岩体条件下是稳定的;并且,坝前Ⅰ、Ⅱ号滑坡在天然状态下整体是稳定的。 |
中文关键词:现今构造应力场 有限元数值模拟 黄河李家峡 |
|
A Study of Present Tectonic Stress Field in and around the Damsite of the Lijiaxia Hydropower Project on the Yellow River |
|
|
Abstract:On the basis of field measurements such as in-situ fault displacement measurement ,crustalde-formation ,focal mechanism solution and stress measurement etc.,this paper gives a further analy-sis of the present tectonic stress field in the given region by the method of finite element numericalsimulation, Boch in-situ measured and simulated results show that the rock body of the dam founda-tion of the Lijiaxia hydropower station ,as a whole ,is stable ,and the whole Ⅰ and Ⅱ landslides infront of the dam are stable in natural state. |
keywords:present tectonic stress field field finite element numerical simulation Lijaxia on the Yellow River |